3. Basic or pouring concrete trench should reach a certain strength, upon acceptance, in order to fill. V. steel product protection1. the entry of raw materials wood should be well pad for sleeplessness, according to specifications, neatly stacked, respectively;2. processing of steel and cement should be project management office, specifications, neatly shape;3. reinforcement after the designated personnel to see reinforced, ensuring rebar in concrete location accuracy;VI. installation removing protection1. clean and protecting the formwork itself complete equipment parts, lifting to prevent collision, piled up reasonable, keeping no deformation of the plate surface. Winter construction, insulation remained intact on the back of the template;2. the template is lifted in place to stable, not collision floors and it has completed construction of the parts may not be stiffened. Adjust template with the crowbar, pay attention to prevent damage to mortar screed template below;3. when removing the program, prohibit the use of a sledgehammer percussion, and prevention of crack in concrete walls and door window appears;4. the template when you bond with the wall, prohibit the use of crane die, prevent wall cracking.VII. plaster product protection1. prior to the door before plastering Windows with crack in the wall joints with packing density of cement mortar (determined by the design of aluminium alloy door and window frame caulking material);2. wipe the prompt settlement of residue in the mortar on the door and window frames, in particular aluminum alloy doors and Windows must be paste protective film and protection was completed when you should clean the glass so far;3. push the car or carrying something, be careful not to touch the bad mouth and walls. Plastering big bumper and large shovels shall not be placed on the wall. No push off the windowsill, to prevent damage to its edges;4. down the scaffolding when you're down with care, after the removal of material should be neatly, not damaged doors, Windows, walls and spat. Needs to protect his daughter reserves buried in the wall pieces, such as the ventilation grates;5. in front of the plaster layer has not yet hardened to prevent fast-drying, water, impact, vibration and compression to ensure ash layer of sufficient strength;6. pay attention to protect the floor, directly on the floor, mixed with ash.VIII. product protection for floors, stairs 1. the wood floor product protection A. wooden floor laying, should not damage the wall surface plastering layer;B. wood flooring material should be neatly stacked, used gently, so as not to damage the edges;C. wooden floor operations should wear soft-soled shoes, and not beat up on the floor and prevent damage to the surface;
การแปล กรุณารอสักครู่..