a) shall identify design changes (such as: Reason for change, the necessity and feasibility), design changes should be documented, such as: design because design changes should also lead to defective control of nonconforming product control program implementation;
B) Evaluation changes have been construction, some affect the installation and on the relevant professional and determine the appropriate measures;
C) , where appropriate, to change review verification (such as a contract or regulatory requirements) necessary for confirmation;
D) changes before implementation approved, approved by the leaders in charge;
E) maintain records of the results of the review to identify changes and changes and corresponding measures.
Design changes should be identified.
Design change documents and records by the person in charge of the project included in the original design file archive send drawing room.
5. Related Documents
5.1 Document control procedures
5.2 recording control program
5.3 design process work instructions
6. Record
6.1 Design Plan
6.2 proofreaders single
6.3 Design Review Record
6.4 design verification record
6.5 design certification records (Authority review concluded)
6.6 design changes single