4.5.3 Re-inspection
when supplies stored longer unusual or storing supplies exceeds the time limit, materials, staff should organize relevant personnel to the goods re-inspection and verification.
4.5.4 unverified supplies emergency release
4.5.4.1 due to construction in urgent need of late inspection and testing, or testing and test results has not been determined eligible goods (must be recovered and replacement without affecting the structure and use of function) when used as inputs , produced by the person in charge of the project that "emergency release material application form", indicating the use of parts of the project, release the reason, reliable recovery procedures, technical director after approval, materials, staff in the hair requisition " Remarks " column indicate " emergency release " words.
4.5.4.2 can not recover, and recover and replace or change affects the structure and function of the use of materials, such as cement, steel, sand, stone, waterproofing materials, additives, welding flux, and other non-load-bearing structure with brick emergency release.
4.5.5 Procurement of materials verification
4.5.5.1 stipulate that the procurement contract for the supply side to the procurement of materials to the verification by the appearance of quality materials, staff procurement of goods, the quality of documentation, specifications and other verification. If necessary, invite professional and technical personnel to the joint verification. And fill "material verification record" (see table), verify that only qualified supplier.
4.5.5.2 procurement contract to the customer when the supplier to supply verification of the procurement of goods, materials, staff, accompanied by the visit, according to the authentication of the contract to perform verification and fill "material verification record", after passing the verification before delivery.
4.6 Handling materials
4.6.1 General materials handling personnel shall be of such material handling and loading requirements. To do for fragile products gently to prevent severe vibration and shock, according to the marking of materials handling direction signs.
4.6.2 for bulky materials or flammable, explosive, handling vulnerability, toxic materials, to transport personnel to appropriate training, pay attention to safety, particular importance when handling materials handling, transport programs to prepare, choose the appropriate handling equipment and tools, handling ban barbaric.
4.6.3 When using mechanical handling of materials , handling personnel should be strictly carried out according to equipment safety procedures.
4.6.4 handling process should pay attention to the protection of personnel handling identification and testing labeled products.
4.7 storage materials
4.7.1 materials entering storage
A ) material storage project team approach librarian should be based on the relevant requirements , arrange open air storage or storage reservoir. Materials, staff and the librarian in charge of material identification.