Two Steel processed by cement engineering project management office, specifications and shapes neatly divided;Three After the rebar, let someone see bars, ensure the reinforcement in concrete position accurately;Six. Large template installation and removal of protectionOne Protect the template itself clean and ancillary equipment parts complete, lifting should prevent collision and reasonable pile up, keep the surface deformation. In winter construction, large template on the back of the insulation measures remain intact;Two Large formwork lifting in place to accurate and stable, no collision floor and other places has completed the construction of, not pocket to tendons. Adjust the crowbar template, it is necessary to pay attention to prevent the destruction of the template below the mortar leveling layer;Three Demolition in accordance with procedures, prohibit the use of hammer percussion, to prevent the crack of concrete wall and window etc.;Four Bonding template and wall, prohibit the use of the crane pull template, prevent the wall body crack.Seven. Plastering product protectionOne Before plastering must advance the door window frame and the wall joint gap at the used cement mortar packing density (aluminum alloy door and window frame sealing material established by design);Two In time to clean the residue in the door and window frame mortar, in particular, aluminum doors and windows must be adhered to the protective film, and to be completed until the completion of the need to clean the glass;Three Push the car or carrying things to be careful not to touch the bad angle and wall. Plaster bar and large shovel shall not be placed on the wall. It is strictly prohibited to push off the ledge, prevent damage to its edges;Four The removal of scaffolding should be dismantled gently, after the removal of the material to be stacked neatly, not damaged windows and doors, walls and quarrel. Pay attention to protect the wall of the daughter of reserved embedded parts, ventilation grate.Five The plaster layer has not yet hardened before should prevent quick drying, water flushing, impact, vibration and extrusion, to ensure that the ash layer has enough strength;Six Should pay attention to the protection of the ground floor, not directly on the ground floor mixed with ash.Eight. Product protection of ground and stairsOne Wood flooring products protectionA. paving wood floor, should not damage the wall plastering layer;B. wood flooring materials shall be stacked, use gently, so as not to damage the edges;C. wooden floor operations should wear soft shoes, and shall not be knocked on the floor, to prevent damage to the surface layer;D. wood floor construction should ensure that the corresponding temperature, humidity, construction should cover plastic film, prevent cracking and deformation;E. floor after the post without surface treatment should be attention should not be colored oil stain pollution, may not be easily grinding stroke on the surface of the sand into the room, not on the ground drag sharp iron heavy pressure;
การแปล กรุณารอสักครู่..
