4.7.11 crane must be operated by the designated full-time driver, others are not free to use.
4.7.12 must have someone to monitor traffic control and safety when large transport.
4.8 Project Group on personnel, especially full-time safety officer should supervise and inspect facilities for safety, lifting operating environment, the use of lifting equipment, safe operation of lifting operations personnel behavior according to the specifications and requirements.
5. Related Documents
5.1 "contingency plan"
6. Record
6.1 "lifting operations plan"
6.2 "lifting operations technical tests"
6.3 "lifting operations safety tests,"
6.3 "construction machinery site acceptance record"