4.13.1 process owners satisfaction survey4.13.1.1 construction in the process of monitoring and measurement carried out by the general contractor during the construction. Monitoring and measurement of organized by the Vice President, to conduct questionnaire. During the construction of the questionnaire content, see the owners satisfaction survey form.Frequency 4.13.1.2 survey: building area of 15,000 square metres unit project from start to completion survey frequency shall not be less than twice to 40,000 square meters building area of 15,000 square meters, the unit works survey frequency shall be not less than three times, building area of more than 40,000 square meters of engineering survey frequency shall be not less than four times. Investigation in Foundation, structure, installation, renovation and construction of different stages.4.13.2 product after the delivery of the owners satisfaction survey4.13.2.1 monitoring and measurement of product after delivery, organized by the General in charge, according to the company's annual return plan (supplementary scheme) during the construction of a return visit at the same time. Fill out the project owner satisfaction survey and the project return records.4.13.2.2 records management and delivery. Total package units in owner satisfaction surveys, project return visit, property owners should be confirmed and signed and sealed on the questionnaire, visit records. Two copies of questionnaires, visit records, investigative units, cement project management office, provide the basis for companies to measure overall satisfaction with project owners.4.13.3 owner satisfaction measure4.13.3.1 cement market according to units at the end of each year to report the owner satisfaction survey during construction and completed projects of the project owner satisfaction survey, respectively, construction company owner satisfaction and project owner satisfaction measure.
การแปล กรุณารอสักครู่..
